Hello All.................I need to move Virtual Machines from Standalone Hyper-V based on Windows Server 2012 R2 to a Hyper-V Failover Cluster based on Windows Server 2012 R2.
- The VMs OS is Windows Server 2012 R2
- Applications installed on VMs are SCCM, SCOM, SharePoint, etc.
1. I am looking for a Checklist that I can run through and move them. To make sure I do not miss out anything.
2. Would a downtime be required in this scenario while the VM is being moved?
3. What requires special attention in this scenario?